Font Size: a A A

The Design And Implementation Of Engineering Construction Subcontracting Management System For Fourteen Bureau Of China Railway

Posted on:2016-03-24Degree:MasterType:Thesis
Country:ChinaCandidate:T WangFull Text:PDF
GTID:2308330461984196Subject:Software engineering
Abstract/Summary:PDF Full Text Request
With the development of construction, the project investment and management have new quality and cost requirements compared with the past, and the proposed bilateral investment management conditions are harsher. The old management system has been unable to meet the requirements of the construction schedule management, quality requirements and cost requirements. Therefore, China Railway 14 Bureau of construction needs an efficient management system to support subcontractors in order to improve the quality and efficiency of construction projects, and to have better control of construction progress and management costs. This is for a firm foothold in the economic globalization, the environment and achieve building regional, transnational business to lay a good foundation.To design a comprehensive construction subcontract management system, designer uses B/S structure and the java language and J2EE development platform and designs applications using J2EE multi-level to add a multi-threaded application server between the client application and the back-end storage. And designer uses struts, servlet, EJB, hibernate and other technology to develop this system. In addition, the system will apply the current popular database SQL SERVER 2012.The core business of this system includes the subcontractor management, professional subcontract management, risk warning management, report management, basic settings. The subcontractor management module realizes the labor team management, tender services management, labor contracts, labor inspection work, labor payments, labor use, service workers payroll accounting, appraisal services, education training, rule regulations, labor inspection team record performance, bond registration, performance bond repayment. Professional subcontract management module realizes the professional work experience subcontracting cost management, professional subcontracts, sub-professional work experience. Risk warning management module achieves the risk warning value set and payment risk warning. Report Management module includes the labor report management and professional subcontractors. Basic Settings module implements the subcontractor management basic set and professional subcontract basis set.The system is designed to truly solve the loopholes existing in the company’s management to make sure the requirements during the construction period, and to make the quality of the construction higher, and to save the project cost effectively, and realize the new target of information technology management.
Keywords/Search Tags:Engineering construction subcontract management, The J2EE, The Struts, UML
PDF Full Text Request
Related items