The Three-year Rolling Plan For Metropolitan Area Transmission Network Of China Mobile Jiangsu Branch

Posted on:2015-07-04Degree:MasterType:Thesis
Country:ChinaCandidate:Y YangFull Text:PDF
GTID:2298330467972401Subject:Electronic and communication engineering
Abstract/Summary:PDF Full Text Request
With the rapid development of Jiangsu mobile business operation, astheservice transmission network and data network, the construction scale isgrowing. At thesame time, along with the changes in technology development and competitiveenvironment, the importance of Metro Transmission Network and data network in networkplanning is becoming increasingly prominent, has become the foundation of the futuredevelopment of the business of Mobile Corporation. At the same time, the existingnetwork development planning and implementation of the interface problems also exist, projectimplementation lags in the planning period,problems of network structure is not reasonable.In order to do a good job of planning of Metro Transmission Network and datanetwork, from the network architecture, the key project support,network optimization to MetroTransmission Network and data networkplanning, began compiling2014-2016MetroTransmission Network andmetro area data network rolling planning.This thesis mainly from the following parts:1, the transmission network for telecommunication base, importance of the developmentof the planning and construction of operators.2, according to the Jiangsu mobile W city planning research, thetransmissionnetwork (including node, transmission system, communication conduit, cable and cable accessnetwork) research, analysis of the status quo. To obtain W, acquisition, related personnelthrough the data of theinterviews of the network architecture, operation condition, analyzes theexisting problems in the existing network.3, the development trend of the transport network, formulate the development strategy inthe planning period, the node that contains theengine room construction goal, constructionstrategy; local target,transmission network development strategy; developmentgoals,communications pipeline construction strategy; development goals, cableaccess networkconstruction strategy, provide a principled basis for building the network of the future plan.4, establish construction project planning period, the actual planning includesthe node, transmission system, communication conduit, cable and cable access networkconstruction scheme of five parts.
Keywords/Search Tags:communications pipeline network, transmission system, fiber-optic network, FullService Operate, planning objectives
PDF Full Text Request
Related items