Font Size: a A A

Evaluation Research Of H Hospital Intergrated Building Construction Project

Posted on:2015-07-25Degree:MasterType:Thesis
Country:ChinaCandidate:X WeiFull Text:PDF
GTID:2284330467473952Subject:Industrial Engineering
Abstract/Summary:PDF Full Text Request
In recent years, as Urbanization speeding up, people’s living standards improve the increase of medical needs and medical distribution imbalance, Lead the medical infrastructure into frenzy. After the hospital project evaluation is an important part of project management. Because the hospital belongs to public welfare projects, strong social, administrative support and intervention, therefore it lack of after evaluation of the project process and the regulation of the target, so it difficult to determine the goal and the management effect of the project. By the project post-evaluation we can sum up the experience of the project management, so as to improve the decision-making and management level of the future new projects. For the problems appeared in the process of project operation opinions and Suggestions, so as to improve the investment benefit. By the fairly and objectively evaluate the project decision makers, managers and workers work performance and existing problems, and can further enhance their sense of responsibility and working level. Therefore. after the project evaluation for hospital project investors is of great significance. For hospital project evaluation from the point of the thesis of public is less, in the actual project evaluation after most using qualitative analysis method to determine the index weight, use of the method of fuzzy Evaluation is also rare.In this thesis based on the theory of project evaluation, according to the characteristics of the hospital project. using the index system of comprehensive analysis to build evaluation index system, the analytic hierarchy process and fuzzy comprehensive evaluation method for the synthesis of theory, and from the project of project decision-making, construction preparation, construction management, project influence square in the face of a comprehensive evaluation of the project construction process. According to the evaluation results, the indicators to evaluate the degree of project success. For each single index to evaluate the proposed according to the evaluation results should pay attention to the project planning stage plan management, in the early stage of the project fully predict risk of each stage, the adoption of countermeasures as early as possible; Should make full use of project funds at the same time, improve and perfect the project function, improve project economic benefits...
Keywords/Search Tags:After the project evaluation, Indicator system, Analytic hierarchy process, Fuzzy comprehensive evaluation
PDF Full Text Request
Related items