Font Size: a A A

The Study Of Water Supply And Drainage System Of Liaoshen Region At Half Of The 20th Century

Posted on:2017-05-27Degree:MasterType:Thesis
Country:ChinaCandidate:L Z FuFull Text:PDF
GTID:2272330482999516Subject:Chinese history
Abstract/Summary:PDF Full Text Request
This article discusses the process of water project construction city of Liaoshen reference to related archives at the half of the 20th century. Studied the city water construction method at all times and in all countries, achievements and so on. Analyzed the situation in the process of water construction in modern times and contemporary, summed up the water construction and management experience in the city, to provide reference and help for the modern city water construction and management.That from the late Qing Dynasty to the founding of the PRC, separated by 918 incident is the definition of time. city water and sewer Liaoning engineering project as the research object.This article is made up of four parts, the concrete content is as follows:The first part is entitled "at the end of the Qing Dynasty in Shenyang City in the process of water system construction", mainly introduced the water project construction achievements and the period of water construction difficulties. Analyzed the water acquisition method, the construction way of Lvshun in this period. Listed some typical case, to sum up the water construction characteristics.The second part entitled "water project construction in the early years of the Republic of China in Liaoshen region", mainly introduces the water construction situation in independent urban in the early period of Republic of China, this part mainly studies the construction of sewer and water of " Manchurian Railways subsidiary " and Zhang’s reign, through the introduction of the typical works of this period, summarize the difficulties and achievements.The third part is entitled "water system construction in Manchukuo period ", mainly introduced the water construction situation in the form of non-autonomous urbanization in the Japanese Planning. Summarized the difficulties and achievements.The forth part is the conclusion, summarizes the lesson and experience in the process of water project construction in modern city Liaoning, and effect in contemporary, and compares Chinese and foreign water project construction and management of the difference in, summed up the problems of our country and the need to improve the place, water the engineering construction to provide reference and help for the contemporary city.
Keywords/Search Tags:Half of the 20th Century, The Liaoshen region, Water supply and sewerage works
PDF Full Text Request
Related items