Font Size: a A A

The Vantai Green World 8# To Residential Quarters Engineering And Construction Quality Control Principles

Posted on:2016-07-17Degree:MasterType:Thesis
Country:ChinaCandidate:X GengFull Text:PDF
GTID:2272330482966196Subject:Project management
Abstract/Summary:PDF Full Text Request
With the deepening of China’s economic reform and market economy continues to improve, as a matter of construction of the pillars of the national economy and basic industries, the development of the national economy played a role. World-renowned management expert Professor Sander Holm also said:"Quality is the golden key to open the world market." Companies in order to make the market stable, stronger, bigger, we must pay close attention to project quality, ensure good works, create their own brand. However, while the rapid development of the construction industry, construction quality management more and more people’s attention, especially in the last two decades, the quality of the project has been the focus of consumer complaints, the state of the construction quality management is particularly valued. Quality management as a key and core construction management, is the main part of the building to enhance core competitiveness of enterprises, improve project quality management become an urgent problem to question.In this paper, based on the quality management background Yantai Green World 8# to residential quarters engineering and related management theory introduced on quality management concepts leads to the Green World 8# to residential quarters engineering and construction quality control principles, quality quality control measures and relevant management theory. In this paper, the theory of Juran’s trilogy, "60" quality management theory, "5s" management model is the theoretical basis of project quality management, as well as paper analyzes the responses Green World 8# quality management factors and can take The theoretical basis. Also on the five major management factors affect the quality of management, namely construction engineering human factors, material factors, construction machinery factors, stage construction method factors, environmental factors, and quality of the project management, namely the feasibility study phase, the project design phase, the project this article stage and final acceptance stage were analyzed. Therefore proposed GreenWorld 8# to residential quarters from the quality of the project management aspects of the above, a plurality of stages of a full range of quality management.In the digestion and absorption of foreign advanced quality control methods and project experience based on the actual situation on the theory and practical applications to find solutions to the problem of Green World 8# to residential district projects, the establishment of a Green World # 8 places quality residential district project control complete control system, and the corresponding safeguards. The proposed method has achieved good results in practical applications, it can provide reference and help for similar projects.
Keywords/Search Tags:Quality Management, Quality Control, Complete Control
PDF Full Text Request
Related items