Font Size: a A A

Qingdao Haibohe Lot 33 Reconstruction Project Schedule Management Research Demolition

Posted on:2016-11-16Degree:MasterType:Thesis
Country:ChinaCandidate:X B WangFull Text:PDF
GTID:2272330473957565Subject:Project management
Abstract/Summary:PDF Full Text Request
Real estate development, urban renewal and implementation of the resettlement program to optimize the allocation of land resources, improve urban living conditions, ease urban housing, land use, environment. traffic pressure, changes in the urban landscape, driving the city’s economic development, the key to building a harmonious society link, and is playing an increasingly important role in the national economy. Demolition project schedule management throughout the project implementation the whole story, from the beginning of the project implementation to be evicted to move back to resettlement. each link exists demolition schedule management, therefore, strengthen the demolition project schedule management, its reasonably determine the progress and effective control is the main content of the project process management. Schedule management will directly affect the level of economic efficiency, the success or failure of the speed and social progress.This paper studies Qingdao Haibohe Lot No.33 reconstruction project demolition schedule management, the main use of the combination of theory and practice, as well as data analysis methods literature studies related to the project schedule management theory, by Haibohe 33 reconstruction project preparation and optimization of land demolition work breakdown structure, schedule, mainly construction schedule management model network diagrams, network diagrams and schedule management plan to optimize Finally Haibohe 33 plots planned reconstruction project demolition progress implementation and control, organization and implementation of major projects, including the demolition plan, the establishment of project responsibility matrix, demolition and checking the progress of the responsibility to implement control demolition schedule. In this paper, a similar transformation of the old theory to help guide the project, for business or demolition unit to provide information to support decision-making in the demolition project implementation process. Other demolition projects can be developed through such research and improve time management plan of the project, so there are plans to implement the project, reducing the risk to extend the duration of the project, to invest resources and minimize costs.
Keywords/Search Tags:Haibohe Lot 33 reconstruction project, Schedule Management, Demolition, Precautions
PDF Full Text Request
Related items