Font Size: a A A

Analysis Of Project Claim On The Base Of The Engineering Contract

Posted on:2015-11-29Degree:MasterType:Thesis
Country:ChinaCandidate:X B HeFull Text:PDF
GTID:2272330470473189Subject:Architecture and Civil Engineering
Abstract/Summary:PDF Full Text Request
With the rapid development of China’s construction industry, more and more in the contract specification at the same time, the growth also prompted claims to work must be more standardization. But because the claim has long has not been paid enough attention to the project of all parties, so that the construction project implementation problems of claim. Among them, the project claim in in a more vulnerable side of the Contractor’s claims are.Engineering claim is a particularly arduous and complex task, as an importantpart of engineering project management, claim handling work situation deeply affect the cost control of construction quality, which directly affect the interests of the contractor. But for a long time, because of the construction industry in our country is deeply affected by the planned economy, and coupled with theproject participants in the construction industry related laws and regulations of the understanding degree is low, the weak awareness of the claim, the project claim has been a very non-standard state. Most of the contractors do not know when can claim, do not know how take measures toeffectively claim. Therefore, the contractor is often not in handling the claimproblem rationally grasp the opportunity to claim, effectively reduce the risk of their own, the legitimate interests to the greatest extent to projects process their own. Process engineering claim events in the Contractor shallis likely to appear on the claim event analysis degree is not enough, various problems in calculation, treatment of the poor. Therefore, the Contractor shallcontract claim work how to deal with in the process of engineering constructionhas become an urgent problem to be solved.In view of the present situation of China’s engineering contract claim above, in order for the construction enterprises in the new contract how to correctly carry out the contract claim to provide ideas and solutions, and the greatest degree of maintenance construction business interests, and effectivelyregulate market behavior in the construction industry, as China actively to meet the international competition in the construction industry to provide protection this paper uses the theory and engineering practice, the method of combining the first from the domestic development situation of domesticcontract claim, contract claim the main forming factors, domestic contractclaims processing methods, a new Fan Benzhong contract on contractprovisions, the new model contract claim under the contract claims, can avoidproblems encountered in the practical engineering case of contract claimproblems and practical engineering case Zhongyuan conditions of contract and claim processing, the actual case in the new contract model under the original contract conditions change processing requirements of generous faceproject contract under the conditions of the project claim analysis, then theresult of theoretical analysis with practical engineering cases were further verified analysis, we obtained a realistic, treatment methods the strong operation. Engineering contract claim process the Contractor shall, in combination with the engineering practice, in accordance with the provisions of the time, issued a notice of intent to claim form, and submit the comprehensivereport of claim in time, then according to the actual engineering and engineersclaim the calculation deviation consultations so as to get reasonablecompensation.
Keywords/Search Tags:Engineering Project, Contract Agreement, Analysis of Claim
PDF Full Text Request
Related items