| Landscaping engineering as one of the important approach of ecological construction, create a beautiful and livable atmosphere has a positive role. In recent years, along with the advance of social economy, people more and more high to the requirement of landscaping engineering effect, but the engineering management major and continue the old model of extensive, due to the botanical garden afforestation project progress management problems, often resulting in increase of construction schedule delay, quality decline such as loss, how to use the project schedule management theory, the botanical garden afforestation construction schedule management for scientific research, reduce the loss of the corresponding, landscaping enterprises need to solve main problems.Based on landscaping Project schedule management as the research object, based on the schedule management, interference management, summarizes landscaping engineering characteristics, on the basis of identification of landscaping construction schedule influence factors, using the Project software decomposition of botanical garden afforestation Project, Project plan, landscaping engineering the construction plan of the main factors affecting progress adjustment, make disposal control plans and delay recovery program, for landscaping engineering Project schedule management provide the beneficial reference and the concrete research content is as follows:1. Use literature induction, through the literature summarizes afforestation project to project on implementation of the object is to have five characteristics, at the same time combined with landscaping project will project is decomposed into three component content,9small component; In reference to the general project of11kinds of influence factors, on the basis of progress by using expert investigation method and Delphi method, identify seven kinds of afforestation project schedule impact factors; Through expert survey method and statistical analysis, identify the seven kinds of progress effect is more apparent in the influential factors of two factors-season, weather.2. Combined with the project schedule management theory, the landscaping engineering schedule management factors, interference management theory content, build landscaping project schedule management, formed from the decomposition of project content project schedule optimization project schedule analysis influence degree to adjust the progress of the main factors affecting the progress plan of emergency plan formulation for a project delay recovery program a complete set of management mode; In the process of using software to complete the Project preliminary sorting decomposition and adjustment of the Project.3. For season and weather factors in influencing factors research, refer to the project management theory content, investigated the influence of seasonal factors, measures and the influence of weather factors and appropriate practice, pointed out the suitable for landscaping construction season and anti-season of necessary measures, in weather factors, introducing the theory of small and medium scale weather interference, leadership and emergency response plans for emergency recovery plan, to ensure that landscaping engineering project construction schedule.4. In the yongding river forest park landscape engineering as an example, this thesis proposed the botanical garden afforestation construction schedule management operation mechanism model for application in the whole process of project construction, effectively solves the project schedule management problems encountered in construction process, and scientific, practicability and rationality of the model is verified. |