Font Size: a A A

A Province "Fire Protection Building Materials Test Center" Project Planning Phase Planning Study

Posted on:2016-09-25Degree:MasterType:Thesis
Country:ChinaCandidate:J X WangFull Text:PDF
GTID:2272330467494185Subject:Project management
Abstract/Summary:PDF Full Text Request
Fireproof construction material is used in the construction engineering highfrequency, wide range of important building material, as The rapid development ofconstruction industry, fireproof construction material quality and the development ofthe whole national economy, the improvement in people’s lives have close tie.Therefore improve the fire-resistant performance of building material and improve theability of fire safety becomes extremely important, starting a new test havecomprehensive analysis ability and it can be applied to fire building materialsinspection agency is imminent. How to ensure that fire protection building materialsinspection organizations achieve fairness and justice, science, public, how to ensurethat test data real and effective, inspection agency behavior standards, standardization,is the important subject facing the inspection institution of fire-proof buildingmaterials.This paper by A province "fire protection building materials test center" projectplanning as an example, in-depth study to explore the fire protection buildingmaterials inspection organizations planning stage management, starting from therefractory quality status of domestic and international building materials analysis,combining with our country the fireproof construction materials testing laboratoryqualification accreditation guidelines, respectively from the inspection center siteconstruction planning, personnel selection, training and inspection management eachstaff responsibilities, fireproof construction material quality inspection centermanagement planning, fire inspection center safeguard measures such aspects as theplanning stage, and discusses how to planning, operation and management of theseresources, make inspection resources fully effective operation, the projectconstruction stage as an organic whole, integrated control of the relationship betweenthe preparation factors.Through the study of this article, the A province can fire protection buildingmaterials test center in the policy transformation, fully positioned itself in the processof detecting open field, forge ahead in the field of industry, improve the corecompetitiveness, big step forward and become a leader in the field of testing of firebuilding materials better in the future to survive and develop in the fierce marketcompetition.
Keywords/Search Tags:fireproof materials, Inspection center, The preparation, Planning
PDF Full Text Request
Related items