Font Size: a A A

Research Of The Integrated Management System Of Power Grid Control Nanchang

Posted on:2015-04-12Degree:MasterType:Thesis
Country:ChinaCandidate:S T YanFull Text:PDF
GTID:2272330467470092Subject:Electrical Engineering and Automation
Abstract/Summary:PDF Full Text Request
In the face of the continuous improvement of the national electric power system,in the face of the development and growth of grid operation management patternalready past not suitable for smart grid current, in order to comply with andstrengthen the development direction of the network forward, we urgently need acomplete, consistent with the current development of power grid intelligentmanagement model. This before on the existing scheduling, dispatching, monitoring,substation operation of the four part of the management mode of research. Theestablishment of suitable for the future development of the smart grid long-termsafety and stable operation of power grid operation mode of the new tube.Analysis on the mode of operation and management of power grid on home andabroad, combined with the development situation Chinese grid, with gridmanagement mode in Jiangxi Power Supply Bureau of Nanchang, now the newcontrol integration mode of operation and management, has carried on the analysis,research and summary of the advanced management mode and suitability model. Thispaper mainly completed the following work: taking Nanchang power grid as anexample, the integration of management regulation of new type under the full detailmake shovel. With the progress of the times, but every time progress is generated inthe production and solve the numerous problems in the."Big operation" system is ayoung proposal, it is in line with the present situation of China’s power grid at thesame time, there are also followed the cause of the problem, this paper has generatedquestions and put forward feasible solutions.Unattended substation possible problems: the remote video image is not up tostandard, telemetry information false, coping happens on-site safety or fire situation,found that the remote substation accident timely arrival rate etc..Location monitoring system: the signal quantity is big, the running status ofequipment remote operation of frequent attention.Scheduling management problem: staff should be equipped with adequate and business ability fully qualified, the rationality of centralized control, supervision andpersonnel at all levels of each operation of the timeliness, the accident occurred whenthe ability to improvise.
Keywords/Search Tags:operation and management, Smart grid, ntegration of dispatchingandsupervisory control
PDF Full Text Request
Related items