Guertu River Five Station Feasibility Study Of Cascade Hydropower Stations

Posted on:2015-06-12Degree:MasterType:Thesis
Country:ChinaCandidate:J F JiaFull Text:PDF
GTID:2272330467456174Subject:Agricultural engineering
Abstract/Summary:PDF Full Text Request
Guertu river is located in east longitude83°40’~83°53’ north latitude44°10’~44°51’. Guertu of river source is located in the middle of north tianshan mountain rock’s shan do-ng section, the source of the ridge above sea level elevation is in commonly4000rn. Is a rivermainly supplied by glacier melt water. The river runoff10.9m3/s, averaged over many yearsmany years average runoff344.3million m3.From an altitude of1000out of the mountain pass to wu yi road near gao gan brakesection,25.5km long river, the river drop405m. The upper river in the piedmont inclinedplain pluvial fan, ground longitudinal slope is slow, flowing through the gravel gobi area,river leakage loss is bigger, wash cutting ability is poor, into a wide river bed.Guertu river has built water conservancy projects have Guertu, new and old feeding andGuertu river diversion main canal. Guertu curve of the new and old river irrigation system arebuilt sand basin, sluice gate and the gate. Guertu river main canal water diversion flow45m3/s average carrying capacity is304million m3, to ensure that the downstream irrigation area of500000mu of farmland irrigation water; New irrigation system, the main canal by Guerturiver total length of25km, after the old feeding to gao gan brake, then through political brakeby willow main canal and high main canal irrigation water.This project proposed Guertu river five power station is meet gul diagram4power afterthe tail water for power generation, and then put into six levels of tail water power stations togenerate electricity. Channel of design flow rate by20.0m3/s, included in the loss of flowand flushing flow, as defined by the19.02m3/s power flow. Five design water purificationplant design head52.03rn, by calculating the main momentum indicators are as follows: theinstalled capacity of8.2MW, guarantee the output of1.39MW, for many years an average of31.94million kW power, h, installed using hours3896h.In this paper, the main job:(1) Consult, collecting, sorting, Guertu river water, engineering geology and waterrelated information;(2) According to relevant data to determine plant installed capacity, the location of theproject, such as project layout plan;(3) Scheme comparison to determine the optimal solution;(4) Economic feasibility analysis of the project.
Keywords/Search Tags:Hydroenergy, Runoff, Installed capacity, Fixed assets value, Static investment
PDF Full Text Request
Related items