Research On Reconstruction Problem Of Harbin Railway Hub Station

Posted on:2015-12-12Degree:MasterType:Thesis
Country:ChinaCandidate:J ZhangFull Text:PDF
GTID:2272330452461115Subject:Project management
Abstract/Summary:PDF Full Text Request
With the rapid development of railway construction in recent years, railwayhub engineering becomes the most important of railway construction projects.The railway hub station becames a bright pearl in the national railway network,and the new landmark of the city. With high investment, huge scale,long periodand so on, Large railway hub station construction needs higher requirements onthe project management level.According to International experience, in a largerailway hub station construction, pre-project study can directly affect on theproject smooth implementation and good operating efficiency. For a long time,because many reseans, the pre-project study becomes a mere formality in ourcountry, which leads to investment out of control and a series of subsequentproblems. How to effectively overcome the pre-project formalization, to increasethe depth and accuracy of the antecedent work, avoid error decision, reduce theinvestment risk, and improve the efficiency and feasibility, we should makepre-project work really give play to decision-making.This article takes renovation engineering of Harbin railway hub station asthe research object, from the background of the national and regionaldevelopment, using the system theory and thoughts, the necessity of the system isanalyzed in aspects of economic, political, social and natural factors on theHarbin railway hub station project.On this basis, we analyzed and expoundedmany contents such as the Harbin railway hub station technical scheme,economic estimation, social risk, environmental protection an so on.Finally, toachieve the management goal of the project, the project management pattern, theprophase management mode and the establishment of the organization andcoordination mechanisms and other issues are analyzed, combining with thecharacteristics of the railway hub station project, the correspondingcountermeasures and the suggestions are put forward.In this article, the research and discussion of prophase managementproblems of the Harbin railway hub station project, will help to ensure thesmooth implementation of the project, to achieve economic, social andenvironmental benefits, and to provide theoretical guidance. At the same time, it will have a strong guidance and reference role for the same type of high-speedrail hub, transportation hub station construction.
Keywords/Search Tags:High-speed rail construction, Harbin railway hub, Stationreconstraction, suggestion
PDF Full Text Request
Related items