Study On The Cost Control Of Architectural Project In Construction Stage

Posted on:2015-03-21Degree:MasterType:Thesis
Country:ChinaCandidate:Q X LiFull Text:PDF
GTID:2272330434965697Subject:Management Science and Engineering
Abstract/Summary:PDF Full Text Request
Cost control throughout the whole process of project construction, and itsmanagement is directly related to the gain or loss on the project, it is the overallmanagement of the project is an important part, therefore pays special attention to thecost control the management more and more to take seriously by the people. Theconstruction phase in construction project is the phase that involves the largest volumeof capital among all other phase. It is also the essential phase that transforms theinvested funds into the construction entity. Construction Phase cost control refers to thetechnique of utilizing cost control theory to keep cost within in the given budget, and atthe same time, to ensure the quality and time limit. The research engineering projectconstruction Phase cost control to consummate the investment organizational reformand strengthen the construction enterprise market competitiveness has the very vitalpractical significance.First, the paper part of the basic theory of the construction phase of cost controlintroduces related concepts of cost control and cost control processes, propose theimportance of the construction phase of the construction project cost control.Secondly, this article focuses on the construction phase of cost control andeffective control methods indispensable. Mainly on the use of earned value analysis andGM (1,1) gray prediction method are combined, promptly identify deviations duringconstruction of the actual value and the planned value, understand the actual status ofconstruction projects. In the pre-construction project using earned value analysis toobtain the cumulative cost deviation rate, effective analysis of the extent and causes ofthe actual deviation from the plan, targeted treatment and monitoring, so that thedeviation gradually reduced; During the construction phase of the project bymedium-term, the use of GM (1,1) gray prediction method to predict the pointimmediately after the cost of the project to predict. Combined with the actual situationin Handan City Economic Development Zone, the construction phase of a project,carried out during the construction cost estimate and deviation analysis to identify thedifference between the actual value and the value of the plan, to take appropriatemeasures to achieve the ultimate purpose of the project cost control.Finally, optimization measures and recommendations proposed project cost control, built on the basis of the principle of earned value cost control warning system, earlywarning control of the construction process, provide the basis for the adjustmentprogress and cost plans; proposed to optimize cost control principles and so on.Establishment of the system, effective cost control methods, ultimately achieve thepurpose of the project cost control.
Keywords/Search Tags:Construction phase, costs control, Earned value concept, Grey PredictionGM(1,1)
PDF Full Text Request
Related items