Font Size: a A A

Shenzhen Light District Comprehensive Pipeline Project Cost Control Research

Posted on:2015-03-03Degree:MasterType:Thesis
Country:ChinaCandidate:D L WangFull Text:PDF
GTID:2272330434956426Subject:Business Administration
Abstract/Summary:PDF Full Text Request
Cost control is one of the construction projects in the three traditional control,cost control is directly related to the success of the construction project, profitable,and the municipal integrated trench construction projects are used as well. Currentlyin China integrated trench construction, there has been a poor cost control led to thephenomenon of construction costs continue to grow,Building trench project broughtmany unfavorable factors. Among them, Shenzhen City as a new zone, the trenchconstruction problems also exist the over cost control problem. Therefore thereasonable cost control of Guang ming New integrated trench construction are favorof the project more efficient and economical construction.Fitstly, this paper analyzes the background and significance of the pipe trenchproject cost control of the stage Shenzhen Guan gming New District and overview thecost control and project of the study dynamics analysis. Then an overview of theconcepts and the theoretical basis of the cost of project control, followed by severaleffective methods for integrated trench construction project cost control summarizedand the following research laid the theoretical foundation. Secondly, we introducethe Guangming New integrated trench cost control situation, and analyze the commoncharacteristics of the ditch and categories, the status of the integrated pipe trenchGuan gming New construction and cost control were analyzed and the summarize theGuangming New integrated trench construction Some cost control existed problems.we proposed construction project cost control proposal of building optimizationstrategies, mainly from the optimization principle of project cost control, cost controlorganizational model optimization, optimization of the design phase of the projectcost control, control of costs in the project bidding phase and then review andfeedback system to optimize the construction phase of the project cost control andoptimization of the project after completion of the project cost optimization control.Finally, according to the Guangming New integrated trench project of cost control problems we proposed project cost control safeguards. Specifically through the development of realistic cost plan, strengthen cost accounting and analysis, optimization project management, sound internal control mechanism, improve project managementmechanism and establishment of an effective incentive mechanism to protect Guang ming New District, comprehensive cost control trench project. This is not only used for Guangming New integrated trench project managers of their maximum benefits. but also for has important practical significance for this industy.
Keywords/Search Tags:Project Management, Cost Control, Integrated Trench
PDF Full Text Request
Related items