Font Size: a A A

Lanzhou District Plan To Highlight The Problem Of Coping Strategies

Posted on:2015-01-07Degree:MasterType:Thesis
Country:ChinaCandidate:L Z SunFull Text:PDF
GTID:2272330434460711Subject:Urban planning and design
Abstract/Summary:PDF Full Text Request
August20,2012, the State Council to the letter [2012] No.104document issued the"State Council agreed to establish Maryland District approved", approved in Gansu Province"on the establishment of the District of Lanzhou instructions", agreed to establish the Districtof Lanzhou. The establishment of the new district to meet the Lanzhou Lanzhou improve theurban functions and optimize the industrial layout needs, the need to create a good ecologicalenvironment and ensure smooth transportation networks, to enhance the strategic position ofLanzhou is important.In this way, this paper discuss the development of the new district has been builtNational Review and Planning evaluation system, and analyzes the outstanding issues thatexist in Lanzhou district plan, which combined with the actual situation in Lanzhou districtplan of research, evaluation system under the plan drawn: Maryland New plan to airportssurrounding environment, ecological construction, siting and petrochemical industry, led byNew Urban Transportation Planning an important building contents, district plan is crucial tohighlight the issue. By studying these four outstanding issues raised related to copingstrategies. Overview entirety and come to the following conclusions:(1) Planning Evaluation SystemWestern planning evaluation based on theoretical system, discusses the evaluationmethods applicable to Maryland district planning.(2) New planning evaluation findings:Lanzhou airport district plan to the surrounding environment, ecological construction,petrochemical industry siting and New urban transport planning is crucial to highlight theirproblems.(3) The district plan highlighted the problem of coping strategies①coping strategies airport construction impacts on the surrounding areaAirport operators of solid waste generated in the boiler room of slag, ground garbage, trashaviation aircraft brings. For centralized processing. Rational and efficient use of the airportand its surrounding areas every minute of land. A certain range of the airport and its vicinityseveral provisions called clearance obstacle limitation surface plane, inclined to limit aroundthe airport and nearby buildings and structures, ultra-high obstacle limitation surface of theobject to be processed.②Lanzhou ecological problemsTo protect and restore natural areas and building systems Qinwangchuan basic ecologicalfunctions as the goal to achieve "point, line, film" closely integrated, full implementation of the ecological space control strategy, considering the green space system planning, resourceconservation, ecological industry and Circular Economy System in three aspects.③petrochemical industry siting coping strategiesCurrently, the layout of the West solid petrochemical industry from multiple levels of securityrisk, urban development, atmospheric environment are unable to meet the development needsof the new situation, therefore, the need for heavy and chemical industries Xigu relocation toaccommodate new developments. Summing up all the conditions for development, on the siteof silver integrated petrochemical industry best conditions.④New urban transport policy issuesStrengthen outreach, regional integration; build a corridor, network development; builddouble network.In strengthening their regional transportation infrastructure, and actively integrate intothe pattern of the national railway and highway network, in order to promote the formation ofthe overall opening pattern.Quick Contact Lanzhou strengthen, and build three fast-track. Western Corridor regionto the West District of solid direction, create a comprehensive corridor, Maryland-Zhangyeintercity rail segment Nakagawa, MD-Nakagawa Airport Freeway, Highway201(upgradedto urban freeway); central channel of the Seven Mile River area to New direction, building anexpressway; eastern channel direction Chengguan district to district, the construction of anexpressway, combined with white orchid regional rail construction, forming Lanzhou-GAOLAN-New City orbitals.Build a "network partition+Contact Channel" double-urban road network structure.Strengthening linkages between channel groups-to form a "systemic","network" backboneof the road network; formation of "Grid" road pattern within the group, optimize networkthrough convergence, expand and extend.
Keywords/Search Tags:Maryland District, planning and implementation effectiveness evaluation, New outstanding issues, New Strategies
PDF Full Text Request
Related items