| With the reform of power system and the rapid development of electric power engineering, project quality supervision is particularly important in power engineering. Electric power engineering quality supervision as an important part of the quality management of electric power project construction, the State shall exercise supervision over the quality of electric power engineering, is to strengthen the project management of electric power engineering construction, power engineering construction in accordance with the law, guarantee the standardization, the precondition to ensure project smoothly.Because of its dynamic power engineering, and important to improve the quality of supervision and management level, but also is the symbol to measure a construction team of technical management level. Electric power project quality supervision is the process, the speed of construction, supervision of the construction quality of the whole, quality supervision is one of the important measures to improve the quality of electric power engineering, we must use the scientific methods and means, management, development of quality supervision and management of electric power engineering project to rule-based. In order to further strengthen the quality supervision and management of electric power project, properly handle the existing quality supervision power engineering problems in the project, under construction to analyze the construction personnel, materials, equipment, construction method and the surrounding environment. Aiming at some problems of electric power project quality management, power engineering construction quality supervision and management, to use the mathematical model to calculate the engineering quality level of the application data, the conclusion data to determine whether the quality of a project standards, thus to overcome quality problems of electric power project, this paper adopts this method, application the actual case to quality supervision level of electric power engineering project this project evaluation, this method is more scientific and normal operation of the supervision and management system of electric power engineering project quality, ability also can improve the regulatory body.According to the characteristics of electric power engineering quality management, from the theories and the method of analysis, using a combination of theory and practice, according to the specific circumstances, from the evaluation results of fuzzy comprehensive evaluation. In this paper, according to the quality supervision and evaluation of electric power engineering using the risk weight to refine the project risk weighting system and evaluation system. Firstly, the hierarchical structure model and application of two two comparative method to construct the risk factors discriminant matrix, finally calculate relative weight. The method used in this paper as a kind of active exploration, can through the practical application in the electric power project and gradually expand the scope of use. But the premise is to ensure that the professional quality evaluation of engineering project is by measuring the conclusion as scientific basis is discussed, the ultimate solution to the problem of quality of talents for construction of engineering quality judgment. If the method can achieve the expected purpose, will increase the project quality supervision and management level, is of great significance for the quality supervision and management of construction project. |