This paper starts from the management status of conventional island debugging in Haiyang (Shandong) project. Firstly, the paper introduces Haiyang nuclear power project debugging management model from the organizational structure, safety measures, quality control, planning, management, and other aspects of the debugging process. The characteristics of this model are strict safety and quality standards and distinct responsibilities of different roles and departments, which determine the modern theoretical system of workflow technology can be well applied in debugging work, contribute to the standardization and systematization of debugging work. According to the main characteristics of workflow technology combining the main features of debugging work, debugging work could be divided into technology, safety, quality, and management of the four systems. And depending on responsibilities and systems, setting up the main roles. The role of the task of debugging connected together through the design process, the formation process operation system. In the process of the design process, the main draw in accordance with the reality of work to improve the management level, a clear division of responsibilities, avoid overly complex concept, specifically describes the planning, mission operations and drawing management of three processes. After the completion of the process to build the system, the establishment of a data structure within the process, considering the demand for data work, and focus on the basis of data exchange and sharing between different functional modules, the paper analyzes the process of debugging a different system needs indicator data collected and presented to the different evaluation methods of test procedures and packages above grade level. For data collection needs a database table structure design, its integrity after the test. Standardization system functional requirements based debugging and debugging of the unit is designed to develop the conventional island debugging management software, the paper describes the main functions of the module design software and applications in Haiyang nuclear power conventional island debugging work. Finally, the paper briefly introduces the prospect research, mainly to improve the automatic scoring method, adding functionality and performance appraisal combined with thermal power debugging and so on. |