Font Size: a A A

PL Copper Mine Construction Project Risk Management

Posted on:2015-03-29Degree:MasterType:Thesis
Country:ChinaCandidate:J J LiuFull Text:PDF
GTID:2271330431478062Subject:Business administration
Abstract/Summary:PDF Full Text Request
PL copper mine construction project is an important project of Yunnan Copper,and it has been explored for prospective reserves of4.8million tons. Because located in the plateau and so closed to scenic spots, PL copper building faces environmental protection, local relations coordination, selection of mining methods, prevention of natural disasters and many other risks. To ensure the smooth completion of the project, construction process requires effective project risk management and control.In this paper, PL copper construction project is an object for the study. The first step is to analyze the situation at home and abroad in the field of risk management,then describe the basic theory and methods. On this basis, through the background PL copper construction projects, scope, technical solutions, schedule, cost plans and other data analysis,it is combined with information on a "brainstorming" to identify the risk factors for the project implementation phase. By "expert scoring method" analysis and evaluation of various risk factors, appropriate measures is proposed to deal with the risk exposure of different magnitude. Finally,through risk monitoring to avoid or mitigate project risk impact on the implementation of the project.Copper resources in china are relatively scarce. The development and construction of PL copper mine is typical. The risk management of the whole process of research about PL copper mine project is a useful attempt at metal mines in the project. It can provide a reference for risk management of mine construction projects by summarizing the research results.
Keywords/Search Tags:project risk, risk management, project implementation, response measures
PDF Full Text Request
Related items