Font Size: a A A

Changde Electric Power Bureau Charging Scheme Optimization Design And Implementation

Posted on:2013-09-12Degree:MasterType:Thesis
Country:ChinaCandidate:M P YunFull Text:PDF
GTID:2269330425972002Subject:Business Administration
Abstract/Summary:PDF Full Text Request
As a core business in power marketing of a power company, electricity charging, which is basic, pilot and innovative, contributes the most in improving economic efficiency of the company. The key to solve the difficulties existed in electricity charging is to innovate and improve the charging scheme. Current charging mode can’t adapt to the new situation of economic and social development, so it is urgent to make a research on this issue and then put forward some solutions.Firstly, this paper studies current situation of electricity charging at home and abroad, focus on several charging methods from the traditional ones to those through the internet or the third-party.Secondly, current situation of electricity charging mode in Changde Electric Power Bureau is analyzed based on the theory of customer satisfaction, of marketing channel, of service marketing and of regulation and etc. According to the results of the survey about the charging mode in Changde Electric Power Bureau, some problems and reasons are found, the necessity to optimize the electricity charging scheme is illustrated.Thirdly, optimized electricity charging scheme is designed. Among which, an integrative platform for electricity charging management is established, a system for intelligent charging management is built, the system of promotion of bank-enterprise internetworking is accelerated, a new product named Home Comfortable Subject Card is issued, the system of electricity charging card is introduced, mobile phone charging system is advanced, many kinds of approaches to collect electricity charges are enlightened, ATM and telephone banking charging are operated and an electricity charging platform though the third-party is set up.Finally, the optimized electricity charging scheme is evaluated, some implementation steps for the scheme are proposed and some safeguards for the implementation of the scheme are developed.
Keywords/Search Tags:Changde Electric Power Bureau, electricitycharging, optimal design, implementation
PDF Full Text Request
Related items