| Quality and schedule are two very important objectives. There are many different reasons that may influence quality and schedule. Construction projects have different characteristics in many different ways, so how to use the basic principle and theory about quality control and schedule control in construction project management to solve the real problem in practice is a research interest.This paper pays attention on the progress and quality management of the power transmission and transformation project of Luoyang Power Supply Company. First of all, the basic principle and theory about progress control and quality control are introduced, and also the relation between progress objective and quality control are demonstrated. Elaborated on the interdependence and interaction of the dialectic between the project progress and quality objectives, as well as the specific methods of control and coordination. Following that, the general information are provided about this project, which provides the content for the research on the control on the schedule and quality of high voltage (220kv) transmission and power transfer in Yichuan district Luoyang City.In the end, considering the real situation of this project, this paper makes research on this matter. Through the analysis on the factor influencing schedule and drawbacks at the beginning stage of this project, the schedule control methods are made. Through the establishment of quality control system, the duty of quality control is ensured, and the quality control is defined throughout the entire whole life of this project. The above demonstration can guarantee the better control on the schedule and quality, which also provide some meaningful suggestion for the power transmission and transformation project of Luoyang Power Supply Company. |