| Now, the level of information has become an important symbol of modernization of a country and region. With the rapid development and wide application of information technology, people are gradually entering a new economic era of information technology-based. In the process of the rapid construction of information technology, companies are increasingly aware of the importance of project management. Because information system projects tend to have their own features like changing frequently, more technical content, less time and so on, the implementation of scientific and standardized management of the project is necessary. The Schedule and control of project as a core element, play a key role in the success of the project.Centralized Medical Booking System project has higher quality requirements as public service project of the Government besides the characteristics of the information system project. Researching schedule and control of this project has important theoretical and practical significance. The specific contents go as following:Chapter1,Introduction. Through the background of selected topic, the author introduces the objectives and significance of the topic. Chapter2,Fundation of researching and literature review. The author introduces the concepts, contents of the project management and schedule management, and summarizes the technologies and tools of the schedule management. Chapter3, Requirement analysis of Centralized Medical Booking System. The author comprehensively analyzes the user needs, business processes, security requirements and system functional architecture of the project. Chapter4, Schedule development of Centralized Medical Booking System. The author introduces the plan design process of this project. Chapter5, Schedule control of Centralized Medical Booking System. Starting with analysis of the factors affecting the progress of the project, the author describes project schedule control model. Based of the model,the author introduces dynamic monitoring of progress control, guarantee and control strategies.Chapter6, Summary, Come to the conclusion. In the thesis,referencing to a lot of project management research achievements of experts combining with Centralized Medical Booking System, using modern project management theoretical knowledge, the author has a more in depth study in schedule development and control of project. Through making the project systematic and structured, the author proposes schedule guarantee and schedule control methods. At the same time, Combing waterfall development model and agile software developmental method, Taking a positive attitude to deal with change, this work is very meaningful attempt in the information systems integration projects.I hope that, the thesis is able to the demonstration of this kind of project as well as other similar projects. |