Font Size: a A A

Development And Implementation Of Key Construction Project Management System

Posted on:2015-02-02Degree:MasterType:Thesis
Country:ChinaCandidate:J Z LianFull Text:PDF
GTID:2268330428498793Subject:Software engineering
Abstract/Summary:PDF Full Text Request
Today’s era is an era of information explosion, as the development andpopularization of information technology and computer technology, the managementinformation system has been deeply into all walks of life, especially the rapiddevelopment of database technology, makes the data can be effective organization andstoring, and processing and efficient utilization. Management information systems arewidely used in public utilities, government offices and commercial applications in areassuch as, dealing with all kinds of information resources for us to provide the veryeffective and reasonable solution.This article designed a set of quanzhou city development and reform commission(NDRC) key project construction management system (hereinafter referred to as thesystem). This system on the basis of the current focus on the needs of the projectconstruction management, based on the characteristics of the key project of projectmanagement and development, combined with the current advanced informationtechnology and management concept, put forward the objectives, principles of theconstruction of the system, then the key project construction management systemconstruction, improve the level of scientific and informationized construction andmanagement of key projects. System is mainly built a key construction project of thedeclaration, review, statistical analysis, news management, system management, andother content of online information management platform, implement all project dataprovided online, real-time dynamic management of the city’s key construction project,tracking service, and constantly monitor, effectively improve the accuracy and timelinessof project statistics, for quanzhou economic development provides the basis ofcomprehensive analysis, assistant decision.This system is based on the key construction project management informationsystem, based on B/S mode to carry on the design and development, combined with the software engineering thought, using UML tools for system requirements analysis, systemdesign, using Java, j2ee platform and SQL Server2000database for system development.Finally using black box testing method, testing system.With the unceasing change of key construction project management requirements,the next step will be on the basis of the current constantly improve and strengthen thefunction of the system, make the system run more efficient, query statistics andmaintenance more convenient and feasible.
Keywords/Search Tags:Key construction project management system, The database managementsystem, sql server, java, B/S, j2ee
PDF Full Text Request
Related items