Font Size: a A A

LT S Project Antenna Development Process And Improvement

Posted on:2014-08-22Degree:MasterType:Thesis
Country:ChinaCandidate:Y Y MaFull Text:PDF
GTID:2268330422965873Subject:Business Administration
Abstract/Summary:PDF Full Text Request
The production of the antenna is a typical made-to-order production, it is different fromother industries and it is the key parts of the communications equipment and terminal products.Especially antenna of mobile phone, one phone one antenna, because different phones havedifferent spatial structure and different band signal requirements. The development process ofantenna need communication with customer design team,3d and2d drawing design, build whichis small batch production, design optimization and improvement, mass production, thenultimately all antennas sent to the terminal manufacturers and assemble to the mobile phone,which requires the antenna development process from design to production, antenna test, andmobile phone test can not have any mistake. This requires that the antenna must be strictly fromdesign to the customer assembly, good design solutions, precision components and assemblies.So how can we meet the needs of customers? How to ensure the effective operation of theantenna development, design and product quality? The process therefore has a vital role in thedifferent steps. For high-level management, the process is a profit model; for the middle-levelmanagement, the process is a management ideas and methods; for the staffers, the process is anoperating specifications and manuals. In short, the process for each level of the people are verypractical, it can make all the works easier. In this paper, according to the actual S project to doantenna development process analysis and improvement by the scientific method, then to doprocess re-built. LT company S project with the increasingly fierce market competition, the leadtime and quality becomes key point for win the project. A few years ago the project lead timeabout two years, now reduced to half a year, the lead time of some projects in China only one tothree months. Mobile phone project lead time shorter directly affects the antenna project leadtime, must meet the needs of customers, so the existing development process problem isbecoming more and more obvious, so the analysis process of the existing problems, processre-build is represent the trend of the antenna industry, otherwise it will be failed in the fiercecompetition.
Keywords/Search Tags:process, process analysis, process re-built, antenna
PDF Full Text Request
Related items