| Quality is the life of construction project.Because of building products have morecharacteristics, such as high security requirements, durability should be up to standard, usefunction widely,individual differences,space fixed and so on. To ensure project quality andmeet the quality requirements for each construction project is particularly important. Thiswill not only directly affect the interests of the state and the people, but also directly affectthe realization "the material basis Chinese dream"."A hundred years greatly account,the quality first",the quality is the life of project.Ensuring and improving the quality of structure is the perpetual subject of structure scope.It has been a striking global trait that people nowadays attach great importance and payclose attention to quality.Therefore,how studies utilizes the advanced quality managementand control method to insure engineering project quality to have important practicalsignificance.Based on the basic theories of quality management and the basic method, andcombined with the quality plan, quality management in the quality assurance system and thequality control, do the following discussion for the Chuangshuang high-speed Huaideservice area project,Firstly, through the various construction projects on the composition factors (man,machine, material, method, central) study, detailed proposed quality projects, and thepreparation of the requirements of quality target and standard of sub project. Secondly, theproject quality assurance system, construction quality assurance organization, and accordingto the project actual situation, formulate preventive measures and Countermeasures in detailthe quality, to manage and control the quality of building construction. Finally, the use ofvarious effective methods of total quality management and quality control, the qualitycontrol system of the project, and put forward the concrete scheme of the project qualitycontrol. |