| With China’s rapid economic development, increasing the amount of electrical energy, electrical energy applications are increasingly being used electricity infrastructure has become relatively weak.Substation construction,As a large-scale integrated projects, Its project management has its own special requirements.Project programme management has been occupying an important position in project management.By analyzing the project management Research both in domestic and international,there is a big gap about the theoretical aspects of modern project management between China and Western countries.Project programme management control principle including Dynamic control principle, Closed loop principle, Feedback Principle, System Principle, Elasticity theory, Network planning principle, etc.This paper focuses on the Demonstration of the project programme objective, the establishment of project Schedule, the adjustment methods of project Schedule and the measures of programme control.Combined with the special characteristics of this project substation, proposed some special requirements for substation Schedule management, these requirements Mainly reflected in four aspects such as security, economy, timeliness and social.Taking Dujiangyan City,Sichuan Province Puyang Smart220KV substation project as the subjects,this study analysis the project overview of Puyang substation, Project organization structure and programme requirements.use the method of progress control about modern project management theory; studying from the decomposition of the substation project work, the control of Project programme, the adjustment of Schedule,the problems during Substation programme controlling and the measures of progress control,etc.Formed a complete and scientific programme management system for the Puyang substation Project.Specifically use the Method of network plan France to study how to use the projects chedule management method in the substation construction and The importance of its use.Simultaneously from the organizational measures, Technical measures, Contractual measures, Economic measures and Management measures these five aspects Separately propose the relative control measures Corresponding with Puyang substation problems expose,this study will provid some valuable experience for the programme management of coming similar projects... |