Font Size: a A A

The Commissioning Party Risk Evaluation And Control Of The Government Investment On Behalf Of The Projects Under Construction

Posted on:2013-04-16Degree:MasterType:Thesis
Country:ChinaCandidate:J ZhouFull Text:PDF
GTID:2252330425972036Subject:Civil engineering
Abstract/Summary:PDF Full Text Request
In recent years, along with the increase of investment in infrastructure in our country, China’s infrastructure construction is in full swing from place to place, it’s the current focus topic to the government of our country that how to realize the completion of the government investment projects fast and good in our country, project management is good or bad is the efficient completion of government investment projects, Chinese project management pattern experienced "Self-construction","Capital construction department system","Headquarters"pattern and so on, but these kinds of patterns are not very ideal in the play of essiciency, in such cases, the construction agent system emerges as a kind of new project management pattern as the times require, whether construction agent system can overcome the phenomenon of the "three excesses"—proposed budget over estimation, budget over proposed budget, settlement over budget—-and reduce or even suppress corruption from the source.Althoughconstruction agent system has certain advantages in the management of government investment projects, as a relatively new theory, from its emergence to application are still in an exploratory stage, the relevant policies and regulations are not perfect enough, and in practice there are still many shortcomings. This article is on all kinds of risks that clients would face in the construction of the projects, client risk index system is built by identificating and analysising those risks which clients would face under government investment of construction agent system, this index system specific include five secondary indexes (decision-making risk, management risk, political risk, economic risk and environmental risk), which can be divided into17third level indexes. By building the client’s risk index system, according to the actual situation of the case, combining with entropy method to measure the client’s risk evaluation,17third indexes are calculated value at risk of the principal, then proposing the appropriate risk control measures based on the basis of risk evaluation.The focus of this article is intended to evaluate the risks and take risk control measures based on the basis of risk evaluation,hope to be able to provide some theoretical basis for risk prevention in the later practical application.
Keywords/Search Tags:construction agent system, risk evaluation, entropymeasurement method, risk control
PDF Full Text Request
Related items