| With the rapid development of our economy, our country appears a lot of mining citiesgradually. There are also a lot of places famous of the rich coal resources, the mining citiesbenefit on the scale of mining of a few years. However, long time mining makes great sideeffect, such as ground fissure, ground collapse, ground subsidence, landslide, landslides andother geological disasters have occurred. According to statistics, the average per million tonsof coal mining subsidence of0.2hectares, in the process of coal formation of miningsubsidence land area of about800000hectares in our country in the past60years. Landsubsidence has seriously affected the local agriculture production, regional economicdevelopment and quality of people’s life, which will threaten the safety of people’s lives andproperty, but also restricts the sustainable development of coal industry.The ecological restoration and reconstruction of the damaged landscape in miningsubsidence area is a hot issue currently. This paper takes the reclamation planning of JuyeLonggu mine subsidence area as an example, forecast according to the settlement schedule ofthe subsidence areas and combining with the engineering and technical measures of groundland reclamation and using the way of digging depth and filling light to reclaime the land inmaximum extent. Finally, an efficient modern agricultural landscape including agriculture,forest, animal, freshwater aquaculture and agricultural ecology leisure area is designed.Through accessing to literature as the main research methods, combined with the New Dragoncoal mining subsidence area of field research, in-depth analysis of mining city landscaperestoration and construction design. |