The Research On Management Of Xinxiang Annual200,000Tons Ethylene Glycol Project

Posted on:2015-02-01Degree:MasterType:Thesis
Country:ChinaCandidate:S F ZhangFull Text:PDF
GTID:2251330428460135Subject:Business Administration
Abstract/Summary:PDF Full Text Request
In the21st century, Chinese economic development and social life depending on chemical products is increasing. But as chemical industry’s main raw material, the oil and gas resource development has been limited. In domestic and international, oil and gas prices are rising. Because of Chinese energy situation, lack of oil, less of gas, relatively abundance of coal, using coal as raw material to develop coal-chemical industry is certainly the best direction. But large scale coal-chemical industry is an emerging industry, it not only requires a huge investment, but requires a lot of cutting-edge technologies. Whoever grasps the most advancing coal chemical production technology, he will grasp the coal chemical industry’s future. Today there are so many coal chemical projects are springing up, how to use an efficient and economical management manner to build up a coal-chemical project and put into operation, has become coal-chemical industry’s a hot issue. Xinxiang annual200,000tons ethylene glycol project was launched after Henan coal&chemical industry group co., ltd was established. It’s one of the first batch projects, which were used for product structure adjustment and competitiveness improvement. The project uses the latest coal-glycol technology in the domestic intellectual property. In the end of March2012, the project successfully opened up the whole chemical process and output qualified products. After several subsequent technological innovation, product quality and production load get continuous improvement. The project has gotten good returns in the product market competition.In this article, Xinxiang annual200,000tons ethylene glycol construction project management process is the research object, a comprehensive analysis has been done on different aspects of the management in different construction phases. Through review of the project construction various stages work, such as decision making, design, construction, commissioning and trial production, etc, procurement, quality control, organizational structure and human resources, information communication and other aspects of management are summarized. Which management manner is more suitable Henan coal&chemical industry group co., ltd. to manage coal-chemical construction project has been studied and summarized.Hope through this research, can provide some valuable references for Henan coal&chemical industry group co., ltd. new coal-chemical projects, and other similar domestic projects construction management.
Keywords/Search Tags:Coal-chemical industry, Construction project, Management research
PDF Full Text Request
Related items