Font Size: a A A

The T Oil Production Construction Projects Bidding Standardized Management Research

Posted on:2013-09-24Degree:MasterType:Thesis
Country:ChinaCandidate:G X TuoFull Text:PDF
GTID:2251330395478444Subject:Project management
Abstract/Summary:PDF Full Text Request
Based on the current bidding laws and regulations as the theoretical basis, to extend the T oil production plant bidding as the research object, according to the time sequence of job of invite public bidding, bidding on the main problems in the process of conducting research, discuss how to ensure the construction project bidding activity success. By summarizing the current bidding in the presence of false invite public bidding, bidding, qualification linked, or heavy price of light quality, qualification is not standard, the evaluation expert authority duty asymmetry, through actual cases, analysis of the root of the problem, put forward T production plant in the future management of invite public bidding, should abandon the" procurement is a corruption prevention tool " wrong understanding, adhere to the principles, strictly, maintain fair; to strengthen the management and training of the operator’s business, enhance the legal awareness and professional level; perfect invite public bidding management system, realize standardized management. And then extended to the present stage of our country, standardization of tendering and bidding management recommendations for improvement, including the perfection of the public bidding law and standard system, strengthening project bidding process supervision, behavior of normative market main body, strengthen action bid the measure such as body integrity and self-discipline. Based on the comprehensive evaluation method on bid evaluation method, the further improvement of the scientific rationality, recommending the non-price bottom bidding, establish new bidding evaluation model, fuzzy comprehensive evaluation idea to apply in engineering bid evaluation.And the analysis of the bidding process in the presence of potential risks, to study how to avoid the risk or reduce the probability of occurrence of a risk, ensure bidding quality. Through the above analysis and research, to draw their own conclusions about the future and bidding management work in the future.
Keywords/Search Tags:construction tender, Bidding management, Management system, Evaluation of the management, Fuzzy model
PDF Full Text Request
Related items