Font Size: a A A

Industrial Design Company To Design Working-hours Of Analysis Based On Detailed Management In The Operation Of The Project

Posted on:2014-02-23Degree:MasterType:Thesis
Country:ChinaCandidate:B RenFull Text:PDF
GTID:2249330398955548Subject:Business administration
Abstract/Summary:PDF Full Text Request
In the modern enterprise management process, the operation of the project to become the main way of business. The project management performance has also become the key factors constrained the competitiveness of enterprises. Therefore, how to control a good time, quality, cost, risk and scope, has become an important part of enterprise management.As for XX Industrial Product Design Company, The design working hours of the designers, engineers and modelers throughout the main line. Through the analysis of the XX industrial Products Design Company existing project management system, diagnosis of the existing problems, proposed design for the design working hours of detailed management. And the introduction of the effective utilization rate concepts. Analysis and forecasting of future sector projects load, optimize the allocation of the resources. To establish the mechanism that a highly efficiently management the project. This study has a reference value for the same type of enterprise project management and the level of performance improvement.
Keywords/Search Tags:Detailed Management, Effective Utilization Rate, Outer Case of Working-hours, Within Case of Working-hours
PDF Full Text Request
Related items