Font Size: a A A

Sweater Production Standards Based On Industrial Engineering Hours To Develop And Study

Posted on:2008-08-11Degree:MasterType:Thesis
Country:ChinaCandidate:C Y MaFull Text:PDF
GTID:2199360242486195Subject:Costume design and engineering
Abstract/Summary:PDF Full Text Request
With the diversification of the grade of market ,the shift of clothing production type especially in sweater knitted from volume-produce ,little type and long-period into small batch quantity ,multi-variety and short-period , a lot of new problems about production management emerged in garment enterprise .For example ,the establishment of more frequent and complicated production plan , the shorter delivery date customers need to obey and so on .Working out man-hour quota is a basic work of enterprise management ,it is an effective way to solve mentioned problems as well as a necessary means of enterprise management toward scientific and standardization ,it is also an important component in the modern enterprise management.After investigating and studying, we found many sweaters enterprises' man hour quota are currently in a dilemma : On the one hand , because the existing working hours management mechanism is not perfect enough ,the lack of working hour reference standards fit production characteristics of the enterprise , working hours ,in the development of the enterprise rely mainly on artificial estimates , its poor accuracy can not accurately reflect the workload due to inaccurate and no timely in information feedback . On the other hand, working hours in the enterprise is the basis to conduct scientific management , control production progress and economic accounting , cost control and product price and so on , in order to improve the competitiveness of enterprises , business leaders have a strong desire to learn to advanced enterprises at home and abroad , introduce a set of standard working hours, and continuously improve the organization and production conditions , increase productivity, but it is very difficult to fix from which part to commence.Author did a detailed investigation at the workshop and collected a large quantity of first-hand information, in-depth study of the production status sweaters enterprises and development trends. In order to change the current inaccurate working hours , unreasonable wage accounting, as well as regular delays in delivery time, unplanned production status, the topics study group used industrial engineering principles to improve the weaving processes, to rationalize the use of equipment, operating motion analysis, operating time research, working hours determination, data analysis, mathematical modeling, and other facets of the work, to study and formulate a set of sweaters knitting and linking standard working hours, and several times in the actual production of the probation , amendment, further implemented, so that working hours eventually in line with enterprise production and control of the actual demand, Now, the set of standard working hours has been implemented in the enterprise, and produce desired effect.
Keywords/Search Tags:Sweaters enterprises, knitting, knitted sweater, motion analysis, standard working hours, productivity
PDF Full Text Request
Related items