Font Size: a A A

Post Evaluation On The Economic Benefits Of Jing Yu220kV Transmission Project

Posted on:2013-07-19Degree:MasterType:Thesis
Country:ChinaCandidate:K ZhouFull Text:PDF
GTID:2249330395976294Subject:Accounting
Abstract/Summary:PDF Full Text Request
With China’s rapid economic development, the demand for electricity and demands are increasing. At present, our power grid construction and development work, the transmission project is the work occupies an important position, one of the research project has a certain academic value and practical significance. Article describes in detail the construction of China’s current power transmission project to study the profile of the power company selected Jingyu "Eleventh Five-Year Plan" period as the period of analysis and evaluation, with reference to research in the power company to obtain Jingyu information and data, Jingyu transmission construction projects for the planning and construction of a detailed introduction and summary.Jingyu220kV transmission grid for this construction project’s financial and social benefits of a comprehensive evaluation and analysis, which analyzes the financial evaluation is divided into profitability, solvency analysis, development capacity analysis, breakeven analysis and sensitivity analysis. Social evaluation into the promotion of regional economic analysis, analysis of the power industry to promote the development of user satisfaction for analysis.This in combination with the current situation Jingyu power company, combined with the local government development planning for the future, built according to the situation Jingyu transmission project after a comprehensive evaluation system. In a comprehensive evaluation of the project and the analysis model based on fuzzy entropy evaluation model, made after evaluation of its overall cost-effectiveness, and draw the corresponding conclusions of the evaluation and analysis..In conclusion, the article made the economic benefits of the project as well as some experience of the problems were analyzed and summarized, and there Jingyu power transmission project related issues raised and solutions proposed corresponding measures.
Keywords/Search Tags:power transmission project, post evaluation on the economicbenefit, fuzzy evaluation, comprehensive evaluation
PDF Full Text Request
Related items