| With the modernization is getting more deeply and more rapidly,electric power is becoming more and more important for society,and electricity has become increasingly scarce.The project construction period in the current situation is an important problem facing many urgent power project construction.At the same time,due to the large power transmission project construction safety supervision and management difficult,will seriously affect the overall results of power transmission project.And a series of impact on the surrounding environment after the construction and operation of the project will have a certain impact on the overall evaluation of the project.To this end,the state began to increase efforts in the construction of power grids,followed by the power grid construction projects are increasing.So the evaluation of power grid project is becoming more and more important.It is an indispensable and important part of the project cycle,which is of great significance to improve the decision-making level and investment efficiency of the project.Power transmission project as a large-scale capital construction project to the development of the national economy has an important influence,so the power transmission project assessment has a very real necessity.This is a comprehensive post evaluation research for Zhangyue110 kV power transmission project,first through the comparison analysis of domestic and foreign construction projects evaluation literature,has a better grasp of the present situation of research on the post evaluation of the project.And then combined with the characteristics of power transmission and transformation project,gives a detailed definition of the power transmission and transformation project post evaluation of the relevant concepts and contents,and main research problems in the power transmission project post project evaluation carried out in-depth analysis and research.The Zhangyue110 k V power transmission project as the research object,respectively the financial benefit,environmental benefits,project construction process and social benefits four level in and from the four levels of refinement of the 15 indexes,constructs the evaluation model of fuzzy language after using integrated GIOWA operator,on this project to make evaluation and analysis,it is concluded that the corresponding conclusion,to verify the feasibility of the model.The research for Zhangyue110 k V power transmission engineering project manufacturing operations provide reference information,at the same time,it can provide reference basis for the overall work of power transmission project,which of our current power grid industry development has important practical significance. |