Font Size: a A A

The Research On Bid Evaluation Method Of Project A Of NO.3Steel Plant In SG Group

Posted on:2013-07-29Degree:MasterType:Thesis
Country:ChinaCandidate:S J LiuFull Text:PDF
GTID:2249330374976103Subject:Project management
Abstract/Summary:PDF Full Text Request
Bidding is an important way for the socialist market economy in the current projects,material procurement and services to, and also is an important part. Its essence is a kind oftransaction. The essence of Bidding is trade. With continuous deepening reform ofmanagement system in infrastructure projects in China, especially since the July1,2003, theformal implementation of "Code of Valuation with Bill Quantity of Construction Works "and"Opinions of the General Office of the State Council on Further Regulating bidding activities",the construction tender contract system was from the local pilot to the whole country. Thecurrent construction market had implemented domestic and international competitive biddingin China, more and more construction projects were determined through bidding. Evaluationwork is the core of bidding, and is both critical and comprehensive meticulous work.SG used of the scientific nature reasonableness of evaluation method directly related tothe success of the tendering and bidding activities, which was of great significance. The coreof bidding bill of quantities is reasonable low bid, but which Led to a lot of problems, if weignored the principles of comprehensive assessment. Even with the comprehensiveassessment approach, due to a large number of qualitative indicators, the current way oftender evaluation is mainly based on the evaluation rate from a experts committee, which Beaffected more or less by subjective factors, and scientific and fairness of the evaluation workwere reduced accordingly. In addition, the key is that how to determine the weight in biddingevaluation index system. SG had been exploring how to scientifically and reasonablydetermine the weight of each index in bidding evaluation index system and reduce subjectivefactors.At first, this paper outlined research of bidding evaluation methods in the constructionproject at home and abroad and analyzed actual problems and drawbacks. Researchbackground and the logical structure were also briefly introduced.Secondly, the actual situation of the project A of NO.3steel plant in SG GROUP wasbriefly introduced. This paper analyzed problems in the evaluation process, and givessuggestions for improvement.Combined with the disadvantages of the current cumulative scoring method and theactual situation of the project A of NO.3steel plant in SG GROUP, using fuzzy math andgrey relational analysis, AHP fuzzy grey comprehensive evaluation model was proposed toprovide a quantitative basis for decision making for the tender Evaluation By studyingTypical evaluation methods in the bidding process. For state-owned enterprises, especially state-owned large and medium manufacturing enterprises, this research has a scientificreference Based on reasonable low bid to determine the bid winner in the bill of quantity.
Keywords/Search Tags:bidding, AHP, grey relational analysis, evaluation methods
PDF Full Text Request
Related items