Font Size: a A A

Research On Method And Application Of Post-evaluation Management Of Distribution Project

Posted on:2013-12-21Degree:MasterType:Thesis
Country:ChinaCandidate:L QiFull Text:PDF
GTID:2249330374964489Subject:Technical Economics and Management
Abstract/Summary:PDF Full Text Request
In this paper, based on the optimization of distribution network construction project management of the overall goal, to the distribution network construction project evaluation optimization management method carries out a detailed research. First of all, the project post evaluation content and method as the theoretical basis of this paper, combined with China’s distribution network construction the general situation and characteristics of the analysis, the distribution network construction project post evaluation management main characteristics. Secondly, this paper studies the distribution project post evaluation, research content includes:the first, from the distribution network construction project implementation process, financial benefits, operation performance, comprehensive influence, sustainability of the five aspects, a detailed analysis of these five aspects of the evaluation content; second, combined with the characteristics of distribution network construction set up after the evaluation index system of management, the index system of refinement to the three layer, summarizes each index of specific evaluation criteria, then presents the evaluating method; third, in order to realize closed loop management target, this paper also introduced after the assessment result deviation analysis method. Finally, a distribution network construction project as an example, the research of index system and evaluation method of project post evaluation.Through the research of this paper constructs the comprehensive distribution network construction project post evaluation index system, designed to improve the distribution network construction projects the overall management level, the assessment after the deviation analysis contributes to the power grid enterprise to find the problem, sum up experience lesson, put forward to improve an opinion, refined management.
Keywords/Search Tags:Post-evaluation, Distribution construction project, Index system, Deviation analysis
PDF Full Text Request
Related items