| Inner Mongolia Kangbashi Thermal for Beijing Limited ("Kangbashi thermal Power") was established on October16,2008. The corporation is responsible for Inner Mongolia Kangbashi2×350MW power plant air-cooled unit (the "Project") construction. The project plans to build2×350MW super-critical, one intermediate reheat, coal-fired, indirect air-cooled condensable gas turbo-generator group, simultaneous constructing Flue gas desulfurization device and SCR denitration device.Current project feasibility research is based on "the depth regulation of thermal power plant feasibility study report " From five aspects of the feasibility of this project:first, through the power system and heat load analyzing and demonstrating projects necessity, Second by researching on site location, fuel, transportation, water sources, ash field, regional stability, and geotechnical engineering, resilience to disaster, desulphurization and denitration, environmental protection and soil conservation, integrated utilization, labor safety, occupational health, resource utilization, energy-saving, human resources and other conditions of the15major plant construction conditions, to demonstrate the projects has these construction conditions. Third, through the use of financial indicators evaluation method and sensitivity analysis of the distribution estimating projects investment and analyzing economic yield to demonstrate the project’s’marketing competitive ability. Fourth, By using the break-even analysis to analyze the investment risks. Fifth, By analyzing the economic and social impact of the project investment, and analyzing of the above four joint demonstration project feasibility, we can proposed the concluding view of the feasibility. |