Font Size: a A A

3 D Project Schedule Management System Analysis And Design

Posted on:2013-12-24Degree:MasterType:Thesis
Country:ChinaCandidate:Y ZhangFull Text:PDF
GTID:2242330395482782Subject:Business Administration
Abstract/Summary:PDF Full Text Request
With China’s rapid economic development, the demand for power construction is more and more. Meanwhile power construction schedule management requirements are also increasing. Effectively improve the progress of the project management level, can improve the construction quality, reducing costs, increasing efficiency. Three-dimensional progress of the project management system is designed in this environment needs.This article introduces an overview of the project, analysis of three-dimensional progress of the project management system design goals and functional requirements, design basis and system of the development of three-dimensional project schedule management system. Through detailed analysis and design system development process, the details of the system architecture, functional framework and modules, complete system design to meet the management requirements of the power construction in progress. Use of advanced virtual reality technology,3D simulation modeling techniques, to provide technical services for the power construction of, to achieve new progress of the project management methods.
Keywords/Search Tags:Three-dimensional, information systems design, project schedulemanagement, Power construction
PDF Full Text Request
Related items