| At present, the climate warming and environmental pollution is threatening the human life, how to improve the efficiency of safe energy is serious problem we have to face. Therefore make the energy, environment and the development of the economy coordinated is our goal. In this paper the heat load of Baoding, based on investigations into the heat load status, status of the heating heat load, and heat status of the investigation and verification are planned and designed. In order to make the heating units achieve the final goal that distribute load heat and electricity best, realize the minimum consumption of the coal, this essay researches two200MW units in the eighth construction of Baoding Thermal Power Plant and analyzes the optimal allocation scheme to optimize the units between the thermal and electrical load. Collecting the operating parameters through testing, using the mathematical analysis tools to get the unit with the unit consumption of steam extraction capacity and power output characteristics of the relationship between the regression equation for the operation of the unit,are to provide the dynamic analysis and operation guidance,and to improve the plant operation safety and economy. based on the the analysis on the thermodynamic property and the thermoelectric characteristics of Thermoelectric load distribution, this paper make the thermoelectric load distribution scheme between two sets of heating units in unheating period for an example to do calculation and analysis. It provides reference for the thermoelectric load distribution in similar thermal power plant. |