| The completion of settlement has been carried out for many years, but there are stillmany problems and deficiencies, resulting in completion of the project settlement cannotfaithfully reflect the true cost of the final project, and not achieve the desired control effect.Despite this stage, the whole process management of the project cost is vigorously, but by thetraditional method of settlement, the completion of settlement as the last link of theconstruction project, still in the construction industry has been attached to. Therefore,improving the completion of the project settlement accuracy, not only to safeguard thecountry’s economic interests, and increase the return on investment of the construction projectto strengthen the supervision of the construction project, it will also ensure that the enterprisesto reduce losses, achieve the desired investment objectives, and improving competitiveness.The paper is against completion settlement of engineering and management models athome and abroad, and put forward the research questions; there is a detailed analysis of largeengineering factors affect the completion of settlement to accuracy is not high for thecompletion of the project, both for the core indicator system to comprehensively andobjectively reflect the impact of the completion of settlement accuracy; application of fuzzytheory of the construction project is completed the settlement of fuzzy comprehensiveevaluation model, and briefly settled in the completion of the construction project, how toapply the evaluation model; specific project examples, the use of quantitative and qualitativeanalysis of the combination mode, fuzzy comprehensive evaluation on real projects, anddeficiencies in the settlement for the completion of the project, it summed up the positivemeasures to improve the completion of the project billing accuracy in order to avoid futureinvestment in the project control process, resulting in unnecessary losses.Finally, this paper studies the impact of construction projects completed settlement offuzzy factors of great significance, it can increase the project after the completion ofsettlement accuracy. Meanwhile, the paper look forward to the completion of settlement forfuture research prospects and played a positive role to improve the completion of billingaccuracy to reduce the project cost. |