Font Size: a A A

The Risk Management Countermeasures Of Ckwr Railway Construction Projects

Posted on:2013-07-27Degree:MasterType:Thesis
Country:ChinaCandidate:W ZhangFull Text:PDF
GTID:2232330371995547Subject:Project management
Abstract/Summary:PDF Full Text Request
The profit is the ultimate goal of building and development company.The construction enterprises making profits is by means of project construction.In the engineering project construction process,the risk is ubiquitous,ever-present risk.To avoid the successful project risk and loss,to guarantee the engineering project implementation completes smoothly,to ensure project construction management goal realization,effective risk management must be promoted.This paper,the project risk management theory as a guide,describes the research background of the project,meaning and purpose,discusses the process and methods of project risk management system,the application of risk analysis and identification techniques、risk analysis、risk control methods of scientific management methods.Combined with the construction management of construction enterprises to implement the project of Chengdu-Kunming outside winding process,this paper describes the use of project risk management:In predicting the risk identification process using a combination of a variety of technical methods to carry out a comprehensive risk prediction and identification;scoring method of risk analysis and evaluation of use of experts at the scene asked for the identified risk factors observed to come to the project’s overall risk level;then developes a project risk control and response plans;meanwhile,the Chengdu-Kunming outside winding project to develop risk management systems and supporting safeguards to conduct a comprehensive risk,to ensure effective risk management.Combination of the winding outside the Chengdu-Kunming project run by risk management theory,this paper obtained the main management and deficiency faces of the construction enterprise engineering project construct controland put forward individual proposal,and proved effective risk management is the guarantee construction enterprise project construction management realizing the goal of the key,to summarize the experience and find shortcomings.
Keywords/Search Tags:Risk management countermeasures, Railway, Engineering project
PDF Full Text Request
Related items