| As China economic, industry and environment policy development, andconsidering local coke plant situation, coke oven gas (COG) gas turbine combinedcycle power plant (CCPP) start to take the place of traditional coke oven gas boilsteam turbine power generation, and becomes one of the best options for surplus cokeoven gas utilization. But COG CCPP application experience is limited even in global,so it's necessary to study the overall plant and get the optimized system solution.We study COG CCPP performance and cost theory, build the performance andcost system analysis model, and verify this model in actual project and then use thismodel to optimize the overall coke oven gas power generation system by analysis thekey parameter impact on overall system performance and cost. |