Analysis And Evaluation On Investment Risk Of BOT Project Of Nalong Expressway

Posted on:2015-10-23Degree:MasterType:Thesis
Country:ChinaCandidate:A M ZhangFull Text:PDF
GTID:2209330488952670Subject:Project management
Abstract/Summary:PDF Full Text Request
Inner Mongolia is the need to further promote Na long highway of the western development strategy, Inner Mongolia is the need to promote sound and fast economic and social development, it is necessary to.Na long motorway take the BOT financing way, it can solve the problem of Zhungeer Qi traffic bureau sources of funding Eros the Inner Mongolia Autonomous Region, but take the BOT construction mode for the investors will have a certain risk, in order to find out the risk factors that affect the construction of expressway, determine the factors impact on the project, should focus on key, for those factors. Smaller neglected can.From the point of view of project construction, the research background of BOT project are summarized, and summarized some domestic and foreign scholars on the construction of BOT model and risk, by comparison and analysis, put forward the purpose and significance of this study, and the research content, finally summarizes the research route of the.Next, more in-depth understanding of BOT financing mode of highway construction, and establish the evaluation index system of Expressway BOT project investment risk came, generalize the risk and characteristics of investment, and ultimately determine the investment risk factor set, through the issuance of questionnaires to relevant industry professionals, and the results of questionnaire analysis, ultimately determine the investment on the project BOT the major influence factors. The establishment of Na long highway BOT project investment risk evaluation model, by determining the index weight, using entropy method, further analysis on the influence factors of larger, eventually determine the sequence of the investment risk factors came of Expressway BOT project.Comparative analysis of highway BOT project and then came the 4 scheme, mainly carries on the analysis, the economic cost and benefit of economic sensitivity analysis, financial analysis, through the comparison and analysis of the indicators to judge the BOT project of national economic benefit and risk resisting ability, namely whether it is economically feasible, whether can achieve the ability to repay loans.The last comprehensive evaluation of investment came on highway BOT project risk, and put forward to deal with all kinds of risk prevention measures.
Keywords/Search Tags:Na long high-speed, BOT mode, Risk assessment, Sensitivity analysis
PDF Full Text Request
Related items