Font Size: a A A

Government Investment Projects Construction Agency Two-stage Evaluation Model

Posted on:2012-02-12Degree:MasterType:Thesis
Country:ChinaCandidate:P ZhangFull Text:PDF
GTID:2199330332993416Subject:Management Science and Engineering
Abstract/Summary:PDF Full Text Request
With china's economic development rapidly and the introduction of the policy of stimulating domestic demand, non-operating construction projects becomes more and more, and investment is increasing. These projects are infrastructure projects that are impact on the livelihood. To these projects, if we still use the traditional management model, we can not only wasting human, financial and material, but also reducing the efficiency of projects construction greatly, what's more, more projects will be failure. Therefore, we need discover a new, more scientific project management model to replace the traditional project management model. In 2004, our country proposed to speed up implementation the "Agent system" to the non-profit government investment projects in《The decision on reforming of the investment system》. That is to say, our country selects the professional project management company through bidding. The company responses for the construction and implementation, and controls of the investment, quality and duration strictly, and transfers the project to the use of units after completion. The application of the model solutes many problems of the actual construction effectively, and improves efficiency, and saves cost. However, it still has some questions, such as lacking of the scientific, objective comprehensive evaluation index system when choice the agent company, the various stakeholders seeking during them, not having the perfectly of the incentive mechanism, the lack of a fee way advanced, scientific, and for promoting to our country. Therefore, we should continue to explore and study the shortcomings of the model, and solve the new problems in the practical application, and improve the model constantly. Though this way, the model can apply and develop better. Thus, it can serve our non-profit government investment projects better.Based on this, this text focuses on research on Evaluation of Construction Agency Two-stage Model summing up the results of scholars at home and abroad. That is evaluation of the choice on agent company at the phase of decision-making, and evaluation of the performance at the stage of the project implementation. At the phase of decision-making, I established the model of competent, and when our country wants to choice an agent company, which comprehensive evaluation index should be considered. And these indicators were sequenced by the importance based on AHP (Analytic Hierarchy Process), in order to reduce the work without losing the scientific and objective. At the stage of evaluation of the performance, I established the model of performance evaluation. And we proposed a performance evaluation way how to appraise an agent company better after completing a construction project. After analysis of two-stage evaluation model, we proposed three optimization strategies from the generation of market cultivation, taking charge of agent system and management and restraint mechanisms. I hope these research results can provide a theoretical basis and practical help for development and improvement of the agent company and construction market in our country.
Keywords/Search Tags:Non-operating investment projects, Agent system, Selection evaluation model, Performance evaluation model, Optimization strategy
PDF Full Text Request
Related items