Font Size: a A A

Jiaxing To Shaoxing Crossing The River Channel Bridge Program Risk Analysis

Posted on:2008-07-30Degree:MasterType:Thesis
Country:ChinaCandidate:F GaoFull Text:PDF
GTID:2192360242473105Subject:Civil engineering
Abstract/Summary:PDF Full Text Request
The great project will face all kinds of hazard in its total life because of long period, big scope, large range and much hazard factors. Now, analysis and control of hazard have become the important problem of the project management in the state of modern project construction.The paper is based on the project of Jia-Shao channels. The project across the Qianjiang River is very difficult to construct, also is different from others. There's much indeterminacy and uncertainty in the course of construction. The hazard runs through the process of the design, construction and management. Much hazard will be charged and reduced through some steps. Some hazard also can be controlled via correspond elusion measure according to its specialty.This paper will do some quantitative analysis for the technique feasibility of the great bridge according to the report of the project. And the paper also will analyze the probability of the expectable hazard,make up the system of the project and provide the reference for the design, construction and management.
Keywords/Search Tags:hazard evaluate, arrangement analysis, Cross-sea Great Bridge, construction period, management period
PDF Full Text Request
Related items