Font Size: a A A

Research On Risk And Profit Of Shenzhen Guangming Common Tunnel

Posted on:2011-02-14Degree:MasterType:Thesis
Country:ChinaCandidate:F J WuFull Text:PDF
GTID:2189360308454675Subject:Management Science and Engineering
Abstract/Summary:PDF Full Text Request
Along with the expansion of construction projects scale and the enhancement of the technical craft complexity as well as the change of the social economic environment day by day, the profit and risk evaluation is becoming more and more difficult. To establish a well rounded profit and risk evaluation model is obviously necessary.This paper takes Shenzhen Guangming distinct Common Tunnel project as an example,analyzes the history,advantages and disadvantages of Common Tunnel, using the common tunnel of Shanghai and Guangzhou as concrete example. Introduces the background of guangming district common tunnel project,analyzes the necessity of risk and profit evaluation in Guangming common tunnel,and gives a comprehensive out view of guangming district common tunnel project. Then the paper introduces the modern theories and models of risk and profit evaluation, which comes to the conclusion that MCS model and DCF model is suitable in this case for the risk and profit evaluation of guangming common tunnel. Then,this paper measures the risk of guangming district common tunnel project,using MCS evaluation method; compares the profit of common tunnel and direct burying,using cash flow method; and get the conclusion that common tunnel module not only bears less risk,but also gets high profit. At last, this paper also gives financial and management suggestions for the construction of guangming common tunnel.
Keywords/Search Tags:Common tunnel MCS model, Profit evaluation, Project management
PDF Full Text Request
Related items