| At present, during the process of low-rental house construction in our country, the source channel being not enough and lack of scientific funds allocation method have been the important factors restricting low-rental house construction smoothly. The construction and fund sources situation of low-rental house have been analyzed in detail here. The experiences of developed countries in low-rental house construction project fund management have been taken as reference. Unifying our country's concrete national condition and characteristic of low-rent housing construction, distributing housing construction bond pattern, increasing low-rent housing special construction cost of commercial housing developmental project, and welfare lotteries pattern to innovate low-rent housing construction funds channel's method have been proposed. According to the characteristic of low-rental house construction project in our country and using the theory of project portfolio management, low-rental house construction fund optimal allocation model is established. A calculation example is used to introduce the concrete application of the model. |