Font Size: a A A

Suizhong Power Plant Phase Ⅱ Construction Project Management Performance Evaluation Studies

Posted on:2011-06-22Degree:MasterType:Thesis
Country:ChinaCandidate:R LiFull Text:PDF
GTID:2189360305453122Subject:Technical Economics and Management
Abstract/Summary:PDF Full Text Request
Constructs market competition intense today in the electric power, the owner is also day by day getting higher and higher to the construction enterprise's request, to the construction quality, the security, the environment request is specially stricter, therefore becomes the people matter of concern more and more about the electric power items of basic construction's achievements appraisal. This article has analyzed the market environment which the electric power construction enterprise faces, introduced the domestic and foreign advanced project achievements appraisal theory. In the union project achievements appraisal and in the electric power project's characteristic's foundation, proposed based on the quality, the progress, the project management and the fund pacifies the power plant second phase project achievements evaluating indicator system. And according to the achievements management appraisal's characteristic, used ultra efficiency DEA the method the power plant second phase four Construction to make the achievements appraisal to pacifying, obtained the Construction achievements management sorting, and carried on the analysis to the result.
Keywords/Search Tags:Project achievements management, Achievements management target, super-efficiency DEA
PDF Full Text Request
Related items