Font Size: a A A

Nvdao Wharf Area Investment Projects Management

Posted on:2010-08-24Degree:MasterType:Thesis
Country:ChinaCandidate:H J YuFull Text:PDF
GTID:2189360275985587Subject:Project management
Abstract/Summary:PDF Full Text Request
Since China's accession to the WTO,With the rapid development of Chinese economy, China has now entered the "world factory" era, become one of the important exporter in the world.Thus, China has become the world port throughput and container throughput and the fastest growing countries.In the good environment influence,Qingdao port with 5 years passed over the course of the 109th tons port,till the end of 2006, the annual throughput reach the Qingdao portcontainer throughput, complete 2.2 million tons 770.2 million TEU.Founded in 1892 in Qingdao, the development of national large port, is also a resource-conserving, environment-friendly,independent innovation, quality frist port.In the popularization of maritime trade transportation, China today, especially large port container port has an important role to promote economic development in China's historical mission.Qingdao is located in jiaozhou bay coast,is a world famous natural harbor.In 2007, with China ocean group of Qingdao, establish formal agreement Qingdao become China's first international container ZhongZhuanGang, China international container terminal and rewriting in dagang homework history .With the increasing market demand and ports in China, further deepen the reform of port construction investment projects by investors. According to the Qingdao port construction planning, Qingdao port projects will further, to deepen.In the port construction project investment process, using the method of systematic project investment risk identification and evaluation, the effective management of risk prevention, completes the transfer, have a strong sense of reality. Based on the nudao work zone to Qingdao area as an example, develop a project of investment and risk management. Looking through an example case rich investment project risk management, investment research instances library application project risk management theory, the experience of investment project risk management application mode.At the same time, nudao areas for development scheme not conduct investment research project risk management, project investment decision-making for the new decision reference. Combined with the characteristics of port construction investment projects, the port construction projects completed investment risk assessment and management of similar projects for future development plan feasibility study or research.This includes chapter 7:The first chapter of introduction, mainly introduce the research background, comprehensive summary of domestic and international research project risk management, research significance, objective, content, method and technology route.The second chapter introduces relate to Qingdao port and female island valley area project profile. Mainly includes status, relate to Qingdao port female island valley area project location, Columbus port female island valley area project planning, etc.The third chapter application system analysis method to identify the risk factors of investment projects.According to the risk factors of attributes and the loss of size, investors could not control for the greater risk control, external environment factors: the political environment, economic policy, throughput, Part can control, risk affect relatively small projects for internal factors: inclement weather, storm, earthquake, construction, transportation, natural deposition in accordance with water, fire, water supply and drainage project contract and contract dispute, due to pay, technical difficulties, the quality responsibility, input and output of two kinds of decision-making and project investment risk factors.The fourth chapter used qualitative analysis and quantitative evaluation experts investigation of project risk factors were studied. That project risk assessment results of 0.5 degrees, can undertake project risk investment. Major risk factors for throughput, input and output decision-making, fire control, etc.The fifth chapter for major risk factors, and puts forward concrete measures of risk management. If multi-function service evade risk; the throughput Establish lifelong education system, employee quality, safety and environmental authentication system, digital three-dimensional enterprise and waterway dredging, special traffic highway maintenance risk management, etc. Using the joint investment, finance, insurance, building construction chosen according to international convention signed in bidding, the transfer of risk as the suggestion.The sixth chapter summarizes research results and conclusions in the lack of that research project, and puts forward the holographic investment risk management model. This pattern is: project material analysis - risk factors identification - risk factors for qualitative analysis and quantitative evaluation risk factors - - main risk factors to evade, management and transfer of the concrete measures.The seventh chapter closing and thanks.
Keywords/Search Tags:Investment projects, Risk management, Port construction, Risk identification, Risk assessment
PDF Full Text Request
Related items