Project Management Of Large Offshore Oil Furnishment Construction Based On Reverse Contract Mode

Posted on:2009-02-19Degree:MasterType:Thesis
Country:ChinaCandidate:L F YangFull Text:PDF
GTID:2189360272987226Subject:Project management
Abstract/Summary:PDF Full Text Request
The thesis introduced the international and home market demand of the large offshore oil furnishment.It also introduced the status of the home companies.Bring forward a question for discussion how to deal with the international and home market demand and project management.The thesis analyze the connotation of engineering management mode.The thesis introduced the international current engineering project management,such as DBB mode,BOT mode,PMC mode,EPC mode,CM mode,DB mode,PFI mode,BOT mode and Partnering mode.Analyzed the several type mode characteristic.Designing a new style project management basis on the Partnering mode applied to the large offshore oil furnishment instruction project.It is reverse contract project management mode,and designed its' organizes frame,work flow,work agreement,together aim etc.The thesis introduced the 4000 ton cane construction project's background. Thought designed implementary content of the reverse contract project management applied to the 4000T offshore crane construction project,in the person of the new project management mode advantage in the large offshore oil furnishment instruction project.It summed up excellence and disadvantage of the reverse contract project management mode through introduced this mode characteristic.It educed the conclusion which this mode adapting to the large offshore oil furnishment instruction project through introduced the actualized strategy of the 4000T offshore crane construction project.It also point to general meaning which this mode applied to the project management field.
Keywords/Search Tags:Reverse Contract, Project Management Mode, Large offshore oil furnishment
PDF Full Text Request
Related items