Font Size: a A A

Study On The Spare Parts Management Mode Of The No.1 Steel-making Plant In Jinan Iron And Steel Group Co.

Posted on:2008-08-07Degree:MasterType:Thesis
Country:ChinaCandidate:L Y YaoFull Text:PDF
GTID:2189360272987142Subject:Industrial Engineering
Abstract/Summary:PDF Full Text Request
The No.1 steel-making plant of Jinan Iron and Steel Group Co. was established in 1958. Through the development of more than 40 years, it has owned fixed assets of 660,000,000 dollars now and the production capacity of 3,340,000 tons per year. Along with the exaltation of the productivity and the increment of the fixed assets, the spare part consumption and the stock also increased sharply. Therefore, in management of spare part, we must probe into the new thinking of management and method constantly, which could meet the development and need of modern production.This text through surveying and studying actually analyses in depth the current situation of spare part management of the No.1 steel-making plant and the weak links existing, use the modern basic theories and method held in store, has studied the whole evolution of spare part management of the factory, has proposed suiting a new theory and method of spare part management of the factory.It propose this text with it is ocular law and a geometric ratio method, it last ABC classification spare part combining together, proportion and VE value confirm its important degree among total amount according to tack spare part, and according to important degree"Key minority --- The A spare part"is found out, thus confirm instead of the office procedure that meets. Through the management of implementing ABC classification, we have avoided the phenomenon in short supply, and the stock structure tends towards rationally. At the same time, the fund turnover decline from 225 days to 74 days.In order to consume the least with the stock the minimum as the goal, on the basis of ABC categorized management, the theory sets up mathematics model of spare part demand quantity,order goods station and ordering goods quantity. By this model, we could get the following quantity: safe stock,the initial order point and ordering goods amount of economy. Through analyzing these data, we can prevent the spare part from short supply, judge the time of ordering goods and confirm the economic batch ordered each time. Through the application, the stock funds descended 6.38% lower than ever, the spare part consumption descended 22.18% lower than ever.
Keywords/Search Tags:Spare Parts Management, Stock, Funds, ABC Classification
PDF Full Text Request
Related items